FLIGHT
SOL 8 END-OF-DAY DOWNLINK STATUS REPORT


Last updated: 12 July 1997, 08:00 PST, Data Controller: Henry W. Stone

Summary Report
Retransmit Requests
Sequence Planning Recommendations & Constraints
Sequence Execution Status
Telemetry Volume
Traverse Hazards (Detected)
Subsystem Reports
Telemetry Processing Anomalies
Press Release



SUMMARY REPORT


Background:

Sequence 50710E:

Sequence 50720E:

Sequence 50810A:

Sequence 50820A:



RETRANSMIT REQUESTS




SEQUENCE PLANNING RECOMMENATIONS

Generate multi-sol safing sequence

  1. Enable auto shutdown (to limit battery usage)
  2. Move alarm based wakeup to 05:45 LST (every sol) to account for adverse tilt.
  3. Perform Level 3 Health check and persistent state table readout at 07:00 LST and 13:30 LST (every sol)
  4. Do NOT perform night-time health checks
  5. Set Modem Heat to 10 minutes
  6. Set Modem Reheat to 5 minutes
  7. Move up daily Shutdowns to 15:30 LST to account for adverse Tilt.
  8. Auto heat WEB to maximum of 35C between 12:00 LST - 15:00 LST.
  9. Sync clock at 15:00 LST
  10. Enable "other devices" to use batteries.
  11. Perform Level 3 health check at 18:00 LST on Sol 9 only.

    MUST REMEMBER TO UNMASK ALL ERRORS WHEN BUILDING NEXT "REAL SEQUENCE"


SEQUENCE EXECUTION STATUS & VEHICLE STATE

SEQUENCE EXECUTION STATUS:


VEHICLE STATE: (AS OF COMMAND: 8130, Shutdown SCET: 7/12/97 06:49 TLST: ???? )


BATTERY STATE/USAGE


SUBSYSTEM STATUS:



TRAVERSE HAZARDS (DETECTED)




TELEMETRY VOLUME




SUBSYSTEM REPORTS


NAVIGATION PERFORMANCE:

THERMAL PERFORMANCE:

COMMUNICATIONS PERFORMANCE:

MOBILITY PERFORMANCE:

POWER PERFORMANCE:



TELEMETRY PROCESSING ANOMALIES



PRESS RELEASE


TBD


Web Page Authors: Henry W. Stone and Allen.R.Sirota

All information on this site, including text and images describing the Rover is copyright © 1997, Jet Propulsion Laboratory, California Institute of Technology and the National Aeronautics and Space Administration.