FLIGHT
SOL 2 END-OF-DAY DOWNLINK STATUS REPORT


Last updated: 6 July 1997, 03:30 pm PST, Data Controllers: Allen R. Sirota and Henry W. Stone

Summary Report
Retransmit Requests
Sequence Planning Recommendations & Constraints
Sequence Execution Status
Telemetry Volume
Traverse Hazards (Detected)
Subsystem Reports
Telemetry Processing Anomalies
Press Release



SUMMARY REPORT


Wakeup:

Sequence 50110W:

  • Sequence 50240T:
  • Sequence 50250V:

    RETRANSMIT REQUESTS




    SEQUENCE PLANNING RECOMENDATIONS
    1. TBD
    1. TBD


    SEQUENCE EXECUTION STATUS & VEHICLE STATE

    SEQUENCE EXECUTION STATUS:

    VEHICLE STATE:


    BATTERY STATE/USAGE


    SUBSYSTEM STATUS:



    TRAVERSE HAZARDS (DETECTED)




    TELEMETRY VOLUME




    SUBSYSTEM REPORTS

    NAVIGATION PERFORMANCE:

    THERMAL PERFORMANCE:

    COMMUNICATIONS PERFORMANCE:

    MOBILITY PERFORMANCE:

    POWER PERFORMANCE:



    TELEMETRY PROCESSING ANOMALIES


    PRESS RELEASE


    Web Page Authors: Henry W. Stone and Allen.R.Sirota

    All information on this site, including text and images describing the Rover is copyright © 1997, Jet Propulsion Laboratory, California Institute of Technology and the National Aeronautics and Space Administration.