FLIGHT
SOL 1 END-OF-DAY DOWNLINK STATUS REPORT


Last updated: 5 July 1997, 02:30 pm PST, Data Controllers: Allen R. Sirota and Henry W. Stone

Summary Report
Retransmit Requests
Sequence Planning Recommendations & Constraints
Sequence Execution Status
Telemetry Volume
Traverse Hazards (Detected)
Subsystem Reports
Telemetry Processing Anomalies
Press Release



SUMMARY REPORT


Wakeup:

Sequence 50110W:

  • Pass 2:
  • Airbag Retraction:
  • Pass 3:
  • Pass 4:
  • Sequences 50130 & 50140:
  • Rover/Lander Comm problem documented under Telecom S/S detailed report.

    RETRANSMIT REQUESTS




    SEQUENCE PLANNING RECOMENDATIONS
    1. Send SHORT sequence morning of Sol2 prior to sunrise with at least the following commands:
      • Abort
      • Clear Errors
      • Read Mem (Persistent state table)
      • Set Param (Disable Hold Comm)
    2. Flush rover sequences prior to sunrise.
    1. None


    SEQUENCE EXECUTION STATUS & VEHICLE STATE

    SEQUENCE EXECUTION STATUS:


    VEHICLE STATE:


    BATTERY STATE/USAGE


    SUBSYSTEM STATUS:



    TRAVERSE HAZARDS (DETECTED)




    TELEMETRY VOLUME




    SUBSYSTEM REPORTS


    NAVIGATION PERFORMANCE:

    THERMAL PERFORMANCE:

    COMMUNICATIONS PERFORMANCE:

    MOBILITY PERFORMANCE:

    POWER PERFORMANCE:



    TELEMETRY PROCESSING ANOMALIES